About three weeks ago I started the interior construction of the Shipping Container Project. So far I have cut out the window and door, framed the office in, installed the window and door, done some preliminary painting, wired in electricity for the entire unit, added an internet line, run underground wiring to the main house, installed insulation and vapor barrier and last but not least, added the drywall. I would have to say the worst is over and now I look forward to more of the finishing work like painting, flooring, connecting the electrical plugs and lighting fixtures. Read full article here: https://www.replicaairguns.com/2017/5/2/shipping-container-project-insulation-and-drywall-installed